Construction Photos 2009-2010 (Page Two)

Magalia Pines Construction Project started in 2009

Building a new 12,000 sq.ft. facilty

Page Two: Roof Sheeting and Internal Framing

(Click here to return to Construction Photos Page One

or here to proceed to Construction Photos Page Three

For a few hundred more pictures, check out our album on Photobucket

Ruben Ybarra and Mike Cabral install OSB sheeting.

Ruben Ybarra and Mike Cabral install OSB sheeting.

Roof is sheeted on one side and nearly half of the other; altogether, 450 sheets are to be nailed to the top of the building..

Roof is sheeted on one side and nearly half of the other; altogether, 450 sheets are to be nailed to the top of the building..

Ruben Ybarra and Chris Jensen prepare to nail a sheet of OSB.

Ruben Ybarra and Chris Jensen prepare to nail a sheet of OSB.

Hi, Guys! Is it hot enough for you up there?

Hi, Guys! Is it hot enough for you up there?

Meanwhile, under the now-partially-shaded structure, framing is under way. Ron Wilbanks lugs 2x6 boards inside.

Meanwhile, under the now-partially-shaded structure, framing is under way. Ron Wilbanks lugs 2x6 boards inside.

Government job? Bob Cook, Todd Smith, John Beall, and Mike Cabral look on (and maybe catch their breath), as Tom Munson nails a board to a sole plate.

Government job? Bob Cook, Todd Smith, John Beall, and Mike Cabral look on (and probably also catch their breath), as Tom Munson nails a stud to a sole plate.

View from the west side: Internal walls going up!

View from the west side: Internal walls going up!



Bottom Border