Magalia Pines Construction Project 2009

Building a new 12,000 sq.ft. facilty

Page Three: Sidewalk along Street, and Roof

(Click here to return to Construction Photos Page One)

(Click here to return to Construction Photos Page Two)

For a few hundred more pictures, check out our album on Photobucket

Jacob McGuire is too small to work but big enough to wear a hard hat

Jacob McGuire is too small to work but big enough to wear a hard hat

Norm Webster and Terry Murry direct traffic during sidewalk construction.

Norm Webster and Terry Murry direct traffic during sidewalk construction

Malachi Meahl and Donna Broughton raise the caution sign for traffic.

Malachi Meahl and Donna Broughton raise the caution sign for traffic

Beverly Stover, Pat Page, and Jackie Koehler stand guard as the sidewalks are installed

Beverly Stover, Pat Page, and Jackie Koehler stand guard as the sidewalks are installed

Concrete is poured for the sidewalks on Lakeridge Circle and Skyway

Concrete is poured for the sidewalks on Lakeridge Circle and Skyway

Pouring the sidewalks

Pouring the sidewalks

Ron and Ruben install roof sheeting

Ron and Ruben install roof sheeting

Jim Hasak works on roof sheeting

Jim Hasak works on roof sheeting

Lots of roof area to cover!

Lots of roof area to cover!

Ruben prepares to install a barge board on the edge of the roof framing

Ruben prepares to install a barge board on the edge of the roof framing


Next layer is 30-pound felt, and on top of that, Don Kepley and Jim Hasak install metal roofing

Next layer is 30-pound felt, and on top of that, Mike Metz and Bob Cook prepare metal roofing sheets for Don Kepley and Jim Hasak to install

Mike Metz and Tom Munson trim roofing panels

Mike Metz and Tom Munson trim roofing panels

The newly installed metal roof shines in the balmy weather God gave us

The newly installed metal roof shines in the balmy weather God gave us




Bottom Border